Handover check · new-builds across CyprusCheck your new home before the final payment.

One list for the developer. Every finding with a photo and the room.

  • A professional property consultant and condition surveyor inspects the home and signs the report.
  • Reports in English.
  • For a structural opinion or a check against the approved drawings, add an ETEK-registered civil engineer or architect to the same order. ETEK is the Cyprus Scientific and Technical Chamber. The engineer or architect does and signs their service in their own name.

What our inspector found in one new-build

Sample · New-build house with pool, Paphos district. Checked by our inspector on 27 and 28 July 2026.

A finger points at an open gap between the entrance door frame and the step, marked with blue tape.Sample reportF03Urgent
Open seal at the entrance door
A hand moves a bathroom tap that is loose in the wall.Sample reportF12Needs work
Loose tap
Marble edge on a roof terrace with an open joint and a stain below, marked with blue tape.Sample reportF01Urgent
Roof terrace: open joint and stain
Bathroom ceiling edge with a wire showing, marked with blue tape.Sample reportF17Needs work
Wire showing from the bathroom ceiling

146

points in 22 areas

19

findings

4

urgent findings (20 points)

15

needs-work findings (86 points)

40

cosmetic points

This is one house. Your report lists what we find in yours.

Not tested. Water was not connected, so taps, drains and toilets could not be tested. The re-check covers them.

See the sample report

Real check, details removed · ETM-26-S002

Who checks your home

Etimo inspector Professional property consultant and condition surveyor

Checks finished homes before you buy or take the keys.

The inspector checks finishing quality. They look for hidden flaws that cost money later. The inspector is not a civil engineer or a valuer. They do not judge structure or value. The report names the inspector.

About your inspector

Why Etimo

What many inspections give you, and what you get with Etimo.

TopicMany inspectionsEtimo
The inspectionRushed: a quick walk-through.A process 2–3× more detailed, run by an extensive playbook. One sample new-build report lists 146 points in 22 areas.
The reportHandwritten, or typed into a template.A digital, beautiful report. What to fix first, then every finding, then a list any builder or the developer can work from.
The toolsStill pen and paper.Best-in-class, newest tech, from the visit to the report.
FindingsOne long, unsorted list.Every finding graded Urgent, Needs work or Cosmetic, with a code and a note: seen, likely or to confirm.
PhotosSent separately, if at all.A photo next to every finding, with the room, the date and the time.
Structure and drawingsYou find and book an engineer yourself.Add an ETEK-registered civil engineer or architect to the same order. ETEK is the Cyprus Scientific and Technical Chamber.

What your inspector checks at a handover

Room by room, inside and out, in the order you walk through the home. Every point goes on one list.

Waterproofing and joints

Roof terraces and balconies: open joints, cracked layers.

Seals at doors and windows

Silicone missing or cracked, gaps at the frame.

Pipes

Damaged pipes, open pipe ends, drain covers.

Railings

Loose tops, rust.

Tiles and grout

Tiles not fully bonded, broken tiles, grout gaps.

Fittings

Sinks, taps, shower heads, towel holders, lights.

Doors and locks

Doors that don’t close, faulty locks, missing keys.

Kitchen

Missing appliances, worktop joints, gaps at the plinth.

Wardrobes

Doors that don’t close, drawers that catch.

Electrical (seen, not tested)

Boxes, visible wires, switches, spotlights.

Openings

Openings left open in plant rooms and walls.

Walls and ceilings

Cracks at ceiling edges, holes, poor paint.

When the check fits

Book as soon as the developer gives you a handover date. Then the developer can fix the list before you sign the handover papers and pay the rest.

  1. 1

    Reservation

    You reserve the home.

  2. 2

    Contract

    You sign the sale contract.

  3. 3

    Build

    The developer builds and finishes.

  4. Check

    Your inspector goes through the home and writes the list.

  5. 5

    Final payment

    You pay the rest.

  6. 6

    Keys

    You move in.

What you get

  • The report

    What to fix first, then every finding with a photo, the room and what the inspector saw: seen, likely or to confirm.

    UrgentNeeds workCosmetic

    6 pages in the sample.

  • A snag list for the developer

    Room by room, in walk-through order. A Fixed box and a Checked box on every point, and lines for signatures.

    9 pages in the sample.

  • The re-check

    The inspector checks the points the developer says are fixed, and tests what could not be tested.

    Part of the Complete package.

  • Your report is yours

    Report, snag list and photos with date and time, as one PDF by email or on WhatsApp. Share it with your lawyer.

Your price

From €399 all in. Four questions about the home build three packages for it. You see your offer before you book.

Essential

The home itself, inside and out to the front door.

  • Rooms, balconies, windows, doors, plumbing, electrics
  • Every finding graded Urgent, Needs work or Cosmetic, with a photo
  • Digital report and a list the developer can work from
Recommended for houses

Complete

Everything the home has, and a second visit after the repairs.

  • Everything in Essential
  • Every outdoor part: pool and pool plant, roof terrace, guest house, plot, walls, garage
  • One re-check after the developer or seller has fixed the findings

Complete + ETEK

Complete, plus a signed opinion by an ETEK-registered engineer.

  • Everything in Complete
  • Structural opinion by an ETEK-registered civil engineer: frame, slabs, balconies, roof, retaining walls
  • Handover: comparison with the approved drawings by an ETEK-registered engineer or architect

Get my offerAbout a minute. Nothing to pay to see it.

At checkout you pay online (card, Apple Pay, Google Pay and more) or by bank transfer. Free cancellation until 48 hours before a visit.

Free guides

Know before you take the keys

All guides and calculators

Questions

What if the developer says it’s fine?
We don’t judge the developer. The inspector writes down what is there, with photos, so you both look at the same list.
Is this the same as snagging?
Yes. In Cyprus a check of a new home before handover is often called snagging. You get one written list of what needs fixing.
What if the water isn't connected yet?
The inspector checks everything else. Taps, drains and toilets go on the list as not tested. The re-check covers them. It is part of the Complete package.
Is this a structural survey?
No. For a structural question, an ETEK-registered civil engineer can give a structural opinion on the same order. ETEK is the Cyprus Scientific and Technical Chamber. Its registered civil engineers and architects do and sign their own services.
Can I add an ETEK engineer?
Yes, when you request the check. An ETEK-registered civil engineer can give a structural opinion on the visible structure. With a handover check, an ETEK-registered civil engineer or architect can also compare your home with the approved drawings. They do and sign these services in their own name. ETEK is the Cyprus Scientific and Technical Chamber. Our inspector is not a civil engineer and does not judge structure.

Handover check for your new-build

Handover check from €399 all in. Pay at checkout, online or by bank transfer.

Etimo bookings

Call or message us before you book.

+357 9791 6892 · [email protected]

Mon–Sat, 9:00–18:00 · English